Cloud migration is the process of moving applications, data and infrastructure from on-premise data centers, or from one cloud to another, onto cloud platforms, often with changes to how they are built and run.

Definition
Cloud migration covers anything from moving a single file server to a cloud virtual machine to transferring an entire data center’s worth of applications, databases and networks. It also includes moves between cloud providers and from self-managed systems to managed cloud services. The goal is usually some combination of lower operating overhead, faster delivery, better resilience and the ability to scale.
Migration is rarely a single event. Most organizations move in waves, starting with systems that are low risk or easy to move, learning from each wave, and saving complex or tightly coupled systems for later. Each application gets a strategy based on its value, technical condition and constraints, ranging from moving it largely unchanged to rebuilding it as a cloud-native system or retiring it altogether.

How it works
A migration starts with discovery. Teams inventory applications, servers, databases and the dependencies between them, often using automated tools, and gather information on usage, performance, licensing and compliance requirements. This reveals which systems talk to each other and must move together, and which can move independently.
Each application is then assigned a strategy, often described as the “Rs”: rehost (lift and shift onto cloud virtual machines), replatform (small changes such as moving to a managed database), refactor or re-architect (redesign to use cloud-native services), repurchase (replace with a SaaS product), retire (switch it off), retain (leave it where it is for now) and relocate (move virtualized workloads with minimal change). The chosen mix shapes timeline, cost and benefit.
Before workloads move, a landing zone is built: the accounts, networks, identity, security controls, logging and cost tracking the migrated systems will rely on. Data is copied and synchronized, applications are deployed and tested, and a cutover is scheduled, usually with a rollback plan. After migration, teams optimize by right-sizing resources, adopting managed services and tuning costs.
Keep learning
Put it into practice
Cloud architecture, migration and modernization on AWS and Azure, planned for reliability, security and controlled cost.
Explore serviceCI/CD pipelines, infrastructure as code, observability and automation that make releases frequent, safe and routine.
Explore serviceCloud security architecture, posture management, identity controls and container security for AWS, Azure and Kubernetes environments.
Explore serviceFAQ
It depends on the number of systems, their complexity and how much change is involved. Rehosting a few servers can take weeks, while moving a large estate with re-architecture can run over many months or longer in waves. A discovery and planning phase gives a realistic timeline for a specific environment.
Lift and shift, also called rehosting, means moving an application to cloud infrastructure with little or no change to its code or architecture. It is often the fastest way to exit a data center, but it does not by itself deliver benefits like auto-scaling or lower operations work, which usually come from later optimization.
No. Cost is one factor, and migration does not always lower it. Many organizations migrate for faster delivery, easier scaling, improved resilience, access to managed services or to stop maintaining hardware. A clear set of goals for each system helps judge whether the migration succeeded.
Talk to a solution architect about where it fits in your roadmap.
