Kanban is a method for managing work by visualizing it on a board, limiting how much is in progress at once and continuously improving the flow of items from request to done.

Definition
Kanban takes its name from the Japanese word for a signboard or visual card. It began in manufacturing, notably in the Toyota Production System, as a way to signal when more parts were needed so work was pulled by demand rather than pushed into the system. In the 2000s, practitioners such as David J. Anderson adapted the idea for software and knowledge work as the Kanban Method.
Unlike Scrum, Kanban does not prescribe roles, fixed-length iterations or particular meetings. It starts from how a team already works, makes that work visible and improves it step by step. Its core practices are to visualize the workflow, limit work in progress, manage flow, make policies explicit, set up feedback loops and improve collaboratively. That gentle starting point makes Kanban popular with operations, support and maintenance teams as well as product teams.

How it works
The team maps its workflow into columns on a board, for example “Ready,” “In progress,” “Review,” “Testing” and “Done.” Each work item is a card that moves left to right as it progresses. The board can be physical or digital, in tools such as Jira, Trello or Azure Boards, and everyone can see at a glance what is being worked on and where items are stuck.
The key mechanism is the work-in-progress (WIP) limit: a maximum number of cards allowed in a column at once. When a column is full, the team cannot start new work there and instead helps finish what is already in progress. This exposes bottlenecks, reduces multitasking and shortens the time each item takes. Work is pulled into the next stage when there is capacity, rather than assigned whenever it arrives.
Teams improve by measuring flow. Lead time, the time from request to completion, and cycle time, the time from starting work to finishing it, show how responsive the team is. Throughput counts how many items finish in a period. Cumulative flow diagrams show where work piles up. Regular reviews of these measures and explicit policies, such as what “ready for review” means, guide small changes to the process.
Keep learning
Put it into practice
Infrastructure, cloud and application support run under clear SLAs, with 24/7 monitoring and a team that knows your environment.
Explore serviceA long-term engineering team that works only on your product, built around your stack, roadmap and working hours.
Explore servicePurpose-built software engineered around how your business actually operates, with clean architecture and full code ownership.
Explore serviceFAQ
No. Kanban uses continuous flow instead of fixed iterations. Teams may still hold regular planning or review meetings, but work is released whenever it is done rather than at the end of a sprint.
Start from current behavior, for example roughly the number of people working in a stage, then adjust. If work often waits with nothing pulling it, the limit may be too high; if people are often idle, it may be too low.
Yes. Many teams use a Kanban board and WIP limits inside Scrum sprints, an approach sometimes called Scrumban. The combination keeps Scrum’s cadence while borrowing Kanban’s focus on flow.
Talk to a solution architect about where it fits in your roadmap.