Scrum is an Agile framework in which a small, self-managing team delivers work in fixed-length cycles called sprints, using defined roles, events and artifacts to plan, inspect and adapt.

Definition
Scrum was developed by Ken Schwaber and Jeff Sutherland and is described in the Scrum Guide, a short document they maintain. It is intentionally lightweight: it defines a structure for teamwork and feedback, not detailed engineering practices. Teams add their own practices, such as code review, automated testing and design methods, inside that structure.
Scrum rests on empiricism, the idea that knowledge comes from experience and decisions should be based on what is observed. Its three pillars are transparency, inspection and adaptation. Every sprint produces a usable increment of the product, which the team and stakeholders inspect so they can adjust both the product and the way the team works. Scrum is widely used for software, but the framework applies to any complex work where requirements are expected to change.

How it works
A Scrum team has three accountabilities. The product owner maximizes the value of the product and orders the product backlog. The developers, meaning everyone who does the work, whether coding, testing or design, create the increment each sprint. The Scrum Master helps the team and the wider organization understand and apply Scrum, and removes obstacles. The team is small enough to coordinate easily, commonly ten people or fewer.
Work happens in sprints, fixed periods of one month or less, with two weeks a common choice. Each sprint starts with sprint planning, where the team agrees a sprint goal and selects backlog items to meet it. A short daily scrum lets developers inspect progress toward that goal and adjust. At the end, the sprint review shows the increment to stakeholders and gathers feedback, and the sprint retrospective looks at how the team can work better next time.
Three artifacts keep the work visible. The product backlog is the ordered list of everything that might be done to the product. The sprint backlog is the set of items selected for the sprint plus the plan to deliver them. The increment is the working result, which must meet the team’s definition of done, a shared quality standard such as “coded, reviewed, tested and deployable.”
Keep learning
Put it into practice
A long-term engineering team that works only on your product, built around your stack, roadmap and working hours.
Explore servicePurpose-built software engineered around how your business actually operates, with clean architecture and full code ownership.
Explore serviceVetted engineers who join your existing team, follow your processes and scale up or down as project demand changes.
Explore serviceFAQ
Not in the traditional sense. A Scrum Master does not assign tasks or own the schedule. The role coaches the team and organization on Scrum, facilitates events when needed and works to remove obstacles to the team’s progress.
The Scrum Guide sets a maximum of one month. Many software teams use two weeks as a balance between enough time to finish meaningful work and frequent enough feedback.
Scrum fits less well for work that is mostly unplanned and interrupt-driven, such as IT support queues, where a flow-based method like Kanban is often simpler. It also struggles when no one can act as an engaged product owner.